Skip to content
An A5 Equipment Inspection Book standing closed, ruled pages inside for routine equipment checks, about three millimetres thick.

Plain Lab · logbook

Equipment Inspection Book

A ten-point checklist, a four-column day book, and notes pages for routine equipment checks.

Specification

Trim
148 × 210 mm · 5.827 × 8.268 in
Pages
60
Leaves
30
Sheets
15
Signatures
3 × 20pp
Spine
3.43 mm
Paper
white
Ruling
lined
Ruling pitch
7.14 mm · 20.25 pt · 9/32 in
Rows per page
24

Twelve checklist pages open the book, ten points to a page: guards in place, leaks, noise, vibration, temperature, lubrication, fasteners, isolation, housekeeping, labels. The same ten questions, asked the same way, is what turns a walk-round into a record somebody can read back.

Twenty-four day-book pages follow, ruled into four columns: Date, Asset, Finding, Action. A finding written once, against the asset it belongs to, is a finding the next shift can act on instead of repeating.

Twelve pages of notes close it out, college ruled, for whatever a checkbox cannot hold. It does not set your inspection interval or your pass or fail criteria. Those are decided by the equipment owner or the rule that applies to the site, and both vary. The checklist gives you the columns; the numbers stay yours.

What is inside

Checklist
12pp
Ten fixed points, guards to labels, so two shifts inspect the same asset the same way.
Day book
24pp
Four columns fixed, so a finding is always tied to the asset and the action taken.
Notes
12pp
College-ruled, for whatever a checkbox cannot hold.
Reference
12pp
The last twelve pages hold conversion tables and emergency numbers, both checked twice rather than copied from one place.

The film

Page by page

A vertical film from our own bench — this page contacts nobody's server to play it, and downloads nothing until you press play.

A vertical film, 52 seconds: the cover, the ruling page, then 5 reference pages. Synthesised ambient bed, no dialogue — captions in three languages.

Real pages

Five pages from the Equipment Inspection Book laid out as cards: a ten-point checklist page, a four-column day-book page, a notes page, a conversion table, and the owner's page.
Five pages from the print file: the ten-point checklist page, the four-column day-book page, a college-ruled notes page, a conversion table, and the owner's page at the front. Ten checklist points, checked the same way by whoever is on shift, is the reason to buy this over a plain pad.
Specification card for the Equipment Inspection Book: checklist, day book, notes, and reference pages, 60 pages total, A5, three signatures of twenty.
12 checklist pages, ten points to a page: guards in place, leaks, noise, vibration, temperature, lubrication, fasteners, isolation, housekeeping, labels. 24 day-book pages follow, ruled into four columns: Date, Asset, Finding, Action. 12 college-ruled notes pages close it out, 7.14 mm pitch. 60 pages total, A5, three signatures of twenty, spine 3.43 mm.

Made at the Hibrkraft bindery, Bogor · about the maker

Books that sit alongside it

Questions

What are the ten checklist points?

Guards in place, leaks, noise, vibration, temperature, lubrication, fasteners, isolation, housekeeping, labels.

What are the day-book columns?

Date, Asset, Finding, Action.

How big is it?

A5 trim, 60 pages, spine comes to 3.43 mm.

Is it dated?

No. Begin it on whichever asset you inspect first.

Does it set my inspection interval?

No. Intervals and pass or fail criteria are set by the equipment owner or the regulation that applies to the site, and both vary by jurisdiction. The checklist gives you the columns; the numbers are yours to fill in.

What ruling are the notes pages?

The notes pages run college pitch, 7.14 mm, twenty-four rows to an A5 sheet.

Why is it that men give so poor an account of their day if they have not been slumbering?
Henry David Thoreau, Walden, 1854

Track Record

  • 15 Years of Work
  • 100,000+ Products Made
  • 4.9 Google Rating · 85 reviews
  • 5 Countries UAE · MY · CA · DE · NL
  • 2,000 pcs Capacity / Month
Trusted by
Pertamina · POLRI · PPLi · Unilever
Covered by
TVRI · Trans7 · MNC Home Living · iNews Radio
In print
Tabloid Nova · Bogor Today · Tren Bogor
Awards
UDUNAN 2020 Winner · Ekraf Jabar · Mitra Jabar
The Hibrkraft team outside the workshop in Bogor
The Hibrkraft team, Bogor
Download the Hibrkraft Company Profile PDF · 18 pages · 15,5 MB

For vendor applications, tenders and corporate partnerships.