Plain Lab · planner
Undated Project Planner
Twelve project pages, twelve finance pages, twelve habit pages across eight marks, four goal pages, twelve reflection pages and dot-grid notes for the rest.
Price
from Rp 58.000
Softcover, French link sewing. Printed and sewn to order.
Ships in 6–14 business days · 7-day returns
Order on WhatsAppTokopediaSoonShopeeSoon
Every cover and binding option is quoted when you order.
Specification
- Type
- Planner
- Trim
- 148 × 210 mm · 5.827 × 8.268 in
- Pages
- 100
- Leaves
- 50
- Sheets
- 25
- Signatures
- 5 × 20pp
- Spine
- 5.72 mm
- Paper
- white
- Ruling
- dot
- Ruling pitch
- 4.94 mm · 14.00 pt
- Rows per page
- 35
- Dating
- Undated
Build it
Rp 58,000
This book has no year printed on it and no month grid inside it. A page fills up, you turn to the next one, and the book keeps working exactly as well in its second year as its first. That is the entire idea: a planner that expires when the paper runs out, not when the calendar does.
The habit page runs eight marks across the top. Six of them are the job: invoice sent, quotation followed up, site visit logged, vendor paid, drawing filed, inbox at zero. The other two sit outside work entirely: a walk taken, something read for no professional reason. A book that only tracked the first six would be a smaller kind of useful.
Twelve finance pages, four goal pages and twelve reflection pages sit around the habit tracker, and thirty-three pages of dot-grid notes take up most of what is left, at 4.94 mm pitch. Dots suggest a line without drawing one, which is why the same page can hold a sketch, a table and a paragraph without picking a ruling in advance. None of it is dated. It waits until you open it.
What is inside
- Project
- 12pp
- For the work itself, tracked as a project rather than a to-do list.
- Finance
- 12pp
- The money side of the same work, kept separate from the habit marks.
- Habit
- 12pp
- Eight marks a day, six of them the job and two of them not.
- Goals
- 4pp
- Four pages, because a goal that needs more room than that has usually become five goals.
- Reflection
- 12pp
- Looking back on a project once it is done, not only planning the next one.
- Notes
- 33pp
- Dot grid at 4.94 mm, for a sketch, a table or a paragraph without choosing a ruling first.
In every book
The same six pages open every book: your details, who to call, the signs to point at when you have no shared language, and the map. They sit at the front because the moment you need them is not the moment to be flicking through.
- How to use it
- One page describing this book, not a different one.
- This book belongs to
- One page for your name and number, so a book that goes missing can come back.
- My details
- Blood group, allergies, who to call. Written once, carried everywhere.
- Emergency numbers
- Forty countries, taken from Wikidata property P2852 (CC0), agreed across two sources, every row carrying its QID. Numbers change and a book does not — verify locally on arrival.
- Point at this
- A pictogram grid captioned in English above and Indonesian below, for when there is no shared language.
- World map
- Natural Earth 110m, public domain, equirectangular, with UTC hour meridians computed from the projection rather than from a timezone database. For orientation and for pointing at, not a navigation chart.
- Conversion tables
- Computed from definitions — 25.4 mm to the inch — and not copied from anywhere, so every row can be checked by anyone holding the book.
- Pen test leaf
- The last page, printed for it on purpose. Every notebook is used this way; printing it deliberately is cheaper than losing the last leaf to it by accident.
The film
Page by page
A vertical film from our own bench — this page contacts nobody's server to play it, and downloads nothing until you press play.
What is inside this book?







The PDF of this book.
We do not sell the design or the PDF. Download it free, with no conditions at all, not even tracking. What we sell is the book, a real object that is genuinely useful and can help your life.
Download PDF PDF · 100 pages · 0.5 MB
Made at the Hibrkraft bindery, Bogor · about the maker
Try the ruling on paper first
The same ruling exists as a free, ready-to-print sheet. Print one, write on it, and decide whether the pitch suits your hand before you order the book.
Dot Grid Paper, 5 mmFree PDF · 5 paper sizes
Books that sit alongside it
- Content PlannerWorks alongsideshares planning
- Fitness Programme PlannerWorks alongsideshares planning
Questions
What are the eight habit marks?
Invoice sent, Quotation followed up, Site visit logged, Vendor paid, Drawing filed, Inbox at zero, Walked outside, Read something not work.
How big is it?
A5, 148 x 210 mm, 100 pages, 5.72 mm across the spine.
Is it dated?
No. It starts on whatever day you open it and keeps going until the pages run out.
What ruling are the notes pages?
Dot grid, 4.94 mm pitch, thirty-five dots to the page.
How many sections does it have?
Six: project, finance, habit, goals, reflection and notes.
The final ends and consummations of actions are nothing at all to a man's nature.
Price
from Rp 58.000
Order on WhatsAppTokopediaSoonShopeeSoon






